What is an ECI tender?

What is an ECI tender?

Early contractor involvement (or ‘ECI’) is a method of construction contracting that allows a builder to become involved, and potentially start work, before the design has been completed. CM (Construction Management), GMP (Guaranteed Maximum Price) and MC (Managing Contractor) are different types of ECI engagement.

What does ECI stand for in construction?

Early contractor involvement (ECi) is an approach to contracting that supports improved team working, innovation and planning to deliver value for money. it involves an integrated contractor and designer team, appointed under an incentivised, two-stage contract.

What is an ECI model?

Early contractor involvement (ECI) is an approach to contracting that can complement either a traditional or novated design and build delivery model. ECI can be used to gain early advice and involvement from a contractor into the buildability and optimisation of designs.

Is ECI a procurement method?

Despite numerous industry reports, uptake of the recommendations has been very limited to date. ECI as a procurement route is a key facet of the UK Government Construction Strategy through to 2020 (Cabinet Office 2016), presenting an immediate opportunity for industry to review and benefit from research undertaken.

See also  How do I track my order as a guest?

What are the methods of ECI?

Methods of ECI Contract ECI Contract refers to contractor engagement early in the project development process, which can occur through a variety of methods such as alliancing, management contracting, Integrated Project Delivery (IPD), or even a conditional two-stage contract in a construction project.

What are the benefits of early contractor involvement?

Early contractor involvement can enable the contractor to:

  • Contribute to the design process.
  • Build a better team-working ethic.
  • Introduce innovations.
  • Advise on buildability, sequencing, and construction risk.
  • Advise on the packaging of the works.
  • Advise on the selection of specialist contractors.

What is ECI and what is its chief advantage to the contractor and client?

ECI enables appointment of a Contractor before details of the project have been fully developed, allowing the Contractor to contribute to design development and planning of the construction phase. Through use of ECI the importance of the Contractor, who is an expert in delivery of construction projects, is recognised.

What is a D&C contract?

Design and construct (“D&C”) is a contractual pattern for project delivery where both the design and the construction is supplied by the Contractor. Legal responsibility for the design, its suitability and the 1.1 performance of the completed works after completion rests with the Contractor to varying degrees.

What is a design and build contract?

Design and build is a term describing a procurement route in which the main contractor is appointed to design and construct the works, as opposed to a traditional contract, where the client appoints consultants to design the development and then a contractor is appointed to construct the works.

See also  How much does a 20ft shipping container cost to ship?

What is a GMP contract in construction?

GMP stands for the guaranteed maximum price. That refers to the highest amount of labor, materials and profit costs the contractor can charge the customer in the construction industry.

What is the ECC contract commonly known as?

NEC3: Engineering and Construction Contract (ECC) The NEC3 Engineering and Construction Contract is the core document from which the options A-F are extracted. It contains all core clauses and secondary option clauses, together with the schedules of cost components and forms for contract data.

What is 2 stage tendering?

Two-stage tendering involves an initial information stage, facilitating early collaboration between client and contractor. For most projects, and especially for those that are more complex, it is useful to obtain input before there is sufficient information available for the main contract.

What does early works mean in construction?

An early works letter is a practical way to get started on a project before the formal contract is finalised. Properly prepared, an early works letter will give both parties protection before the final contract is put in place.

How many NEC contracts are there?

The New Engineering Contract (NEC), of which the Engineering and Construction Contract (ECC) forms a part, is a suite of standard form construction contracts created by the Institution of Civil Engineers. There have been three editions: the first in 1993, the second in 1995 and the most recent – NEC3 – in June 2005.

How does NEC Option C work?

Option C is a target cost contract with an activity schedule where the out-turn financial risks are shared between the client and the contractor in an agreed proportion. This document contains all the core and secondary option clauses, the schedules of cost components, and contract data relevant to an option C contact.

See also  What is the first thing to shift in a new house?

What is an NEC 4 contract?

The NEC4 Alliance Contract is a multiparty contract for the appointment of a number of partners to create an alliance to deliver a major project or programme of work.